Juen 8, 2009- As Chief 723 went responding to the first call, he advised county of a fuel spill near 252 Dock Street, Schuylkill Haven. Since 727 and 733 were already responding to the accident scene, Chief Donatti had asked to have station 4 dispatched to handle the fuel spill. Engine 737, Squad 739 and Squad 726 responded to the spill and used about 50 gallons of absorbent to clear everything off the road. Time out was 40 minutes.
You may also like
July 28, 2020 – Commercial Building Fire
July 28, 2020 – At 11:18 while units still operated at the previous house fire, a call was transmitted for smoke in a commercial building, at 270 Route 61 South — The Sheetz Gas Station. The communications...
630 views
July 28, 2020 – House Fire West Penn Street
July 28, 2020 – At 10:18, the Schuylkill Haven Fire Department along with Pottsville L-51 and Cressona Engine 41-10 were dispatched to 7 West Penn Street, for a house fire. Engine 63-14 was the first to arrive on...
597 views
April 27, 2020 – Working Fire (Fair Road) Wayne Township
At 14:58, Stations 2 & 4 were dispatched to 1881 Fair Road, Wayne Township for possible building fire. Chief 34-05 arrived on scene and confirmed a working fire with multiple tractor trailers involved. Fire...
586 views
Add comment